Skip to content

SHEET 05 · SERVICE LINE 03

HDD

With over a decade of experience and over 100 crossings completed, RM Engineering is ready to take on your toughest trenchless crossings. Our combined experience of down-hole drilling and HDD crossings provides unique drilling insights to optimize drilling time while managing frac-out risk.

HDD rig set up at a crossing site
HDD crossing site OWNED

SET PIECE · THE CROSSING

01 · SURVEY

  1. 01 SURVEY
  2. 02 PILOT
  3. 03 REAM ×2
  4. 04 PULLBACK
  5. 05 AS-BUILT

100+ CROSSINGS · A DECADE OF EXPERIENCE

01 · Scope of services

  • Front End Engineering and Design (FEED)
  • Engineered and Executable Crossing Designs
  • Complex Curve and 3D Drilling Design
  • Detailed and Practical Pipe Lifting and Breakover Design
  • Drilling Mud System Design and Evaluation
  • Annular Pressure Curves
  • Pipe Stress and Pullforce Calculation
  • Equipment Specification
  • As-Built Drawings and Radius Evaluation
  • Wellsite Supervision / HDD Inspection
  • Contractor Engineering Support

ON CALL 24/7

Get across

Start a project